Tall buildings in London are decided on tall-building policy, townscape impact and, since 2023, on whether the safety case holds up at the Building Safety Regulator. The design has to answer all three at once.

We work with developers, corporate occupiers and institutional landlords on schemes where the approval process is as demanding as the design.

What we deliver on tall-building projects

  • Site appraisal, massing studies and development capacity analysis
  • Townscape and visual impact coordination, including verified views
  • Pre-application engagement with the borough and, where relevant, the Greater London Authority
  • Design review panel presentations
  • Full planning applications and Environmental Impact Assessment coordination
  • Building Safety Act gateway submissions
  • Technical design, facade coordination and construction information

Tall-building policy in London

Under the London Plan, boroughs must identify where tall buildings are appropriate, and applications are assessed on visual, functional, environmental and cumulative impacts. In practice that means:

  • Whether the site is inside a designated tall-building zone in the local plan
  • Impact on protected vistas and the London View Management Framework
  • Effect on strategic and local views, heritage assets and their settings
  • Wind microclimate, daylight and sunlight, and solar glare
  • Aviation and telecommunications safeguarding
  • Fire safety, evacuation strategy and access for the fire service

Applications referable to the Mayor — which includes buildings above defined height thresholds in Central London and elsewhere — go to the GLA for a stage one report before the borough determines them.

The Building Safety Act regime

A higher-risk building is one at least 18 metres tall or with at least seven storeys, containing two or more residential units, or a care home or hospital of that height. These buildings pass through three gateways:

GatewayWhat happens
Gateway 1Fire safety considered at the planning stage. A fire statement is submitted with the application.
Gateway 2Before construction begins. The Building Safety Regulator must approve the design. Work cannot start until it does.
Gateway 3On completion. A completion certificate is required before occupation, and the building is entered on the register.
Programme reality: Gateway 2 has been taking substantially longer than the statutory target period, and the design must be far more developed at that point than under the old building control regime. We build that into the programme from the outset rather than discovering it late. Check the Regulator's current published timescales before fixing your programme.

The Act also introduces the dutyholder regime and the golden thread — a maintained, accurate digital record of building information handed over at completion and kept live through occupation.

Sustainability and net zero

  • Whole-life carbon assessment, required for referable applications in London
  • Circular economy statement and a be lean, be clean, be green, be seen energy strategy
  • Urban greening factor and biodiversity net gain
  • BREEAM and, where a client requires it, NABERS UK design for base building energy performance

How we work with corporate clients

Board-level reporting, a named project director, and a programme mapped against your own approval gateways and investment committee dates. We can act as lead designer and principal designer under CDM 2015, and work under a standard RIBA or bespoke appointment.

Indicative programme

StageTime
Feasibility and capacity study3–6 weeks
Concept design and pre-application3–6 months
Planning determination — major application13 weeks minimum, commonly 6–12 months with a planning performance agreement
Technical design to Gateway 26–12 months
Gateway 2 determinationConfirm current Building Safety Regulator timescales at the time of submission

Included as standard

What you get

  • Development capacity and massing studies
  • Planning policy and tall-building zone appraisal
  • Pre-application and GLA engagement
  • Design review panel presentation material
  • Verified views and townscape coordination
  • Full planning application and EIA coordination
  • Fire statement and Gateway 1 compliance
  • Whole-life carbon and circular economy statements
  • Gateway 2 design submission to the Building Safety Regulator
  • Facade design and specialist subcontractor coordination
  • Golden thread information management
  • Lead designer and principal designer duties under CDM 2015

Questions

Common questions

What counts as a higher-risk building?
A building at least 18m tall or with at least seven storeys that contains two or more residential units, plus care homes and hospitals meeting the same height threshold. Those buildings go through the three-gateway regime overseen by the Building Safety Regulator.
How long does Gateway 2 take?
Longer than most programmes originally allowed for. Timescales have moved as the Regulator has built capacity, so confirm the current published figures before fixing a programme, and get the design to a genuinely complete state before submitting.
Which applications go to the Mayor?
Applications that meet the referable thresholds in the Mayor of London Order — which include tall buildings above defined heights depending on location, and developments above set unit or floorspace numbers. The GLA issues a stage one report before the borough decides.
Do you work as part of a wider design team?
Yes. On schemes of this scale we work alongside planning consultants, structural and services engineers, fire engineers, facade consultants, cost consultants and townscape specialists, either leading the team or as part of it.
Can you present to our board or investment committee?
Yes. We provide a named project director, board-level reporting and material prepared for investment and planning committee dates.
What appointment do you work under?
Standard RIBA appointment documents, or your own bespoke form. We are happy to work under a client-side or contractor-side novation arrangement.

Free 20-minute consultation

Ready to see your drawings?

Send us the address and a sentence about what you want to build. We will come back with a fixed fee, a programme and the planning route we would take.

Email us Get a quote