Design and build closes that gap. One appointment, one price, one programme, one company carrying the risk.
What design and build actually means
Under a design and build contract you appoint one organisation to both design the project and construct it. You hold a single contract for a single price. If a detail turns out to be unbuildable, that is our problem to solve at our cost — not a change order sent to you while two firms argue about whose drawing was wrong.
You still get a full design process. What you do not get is the handover point where responsibility quietly changes hands.
Where it saves you money
- No design-to-site translation loss. The people building it were in the room when it was drawn.
- Buildability priced in from the start. Our estimators see the design while it can still change cheaply, not after planning has fixed it.
- Overlapping programme. Long-lead items — steels, windows, roof lights — can be ordered while the building regulations package is still being finalised.
- One preliminaries bill rather than a consultant's fee plus a contractor's margin on the same coordination work.
- Fewer variations. Variations are where fixed-price builds turn into open-ended ones, and most of them start as a drawing that did not resolve a junction.
Where it is not the right answer
Two ways to run it
Full design and build
We take the project from the first survey through to handover: survey, design, planning, building regulations, structural engineering, construction, building control sign-off and warranties. One contract, one price, one programme.
Contractor's design portion
You keep the architectural design with us but we also build, with defined elements — structure, services, envelope — designed by our specialist subcontractors under our coordination. Common on commercial fit-out and larger residential.
Contract and payment
We work under standard JCT forms rather than our own paperwork, because standard forms have been tested in court and yours has not:
| Project | Typical contract |
|---|---|
| Loft, extension, refurbishment | JCT Minor Works Building Contract |
| Larger residential and small commercial | JCT Intermediate, or Minor Works with Contractor's Design |
| New build and major projects | JCT Design and Build Contract |
Payment is by monthly valuation against work actually completed, certified before it is invoiced. Never a large deposit up front, and never payment in advance of work done. There is a defined completion date with liquidated damages, a defects liability period after handover, and a retention held until defects are made good.
What happens on site
- A named project manager, on site regularly, who is your single point of contact throughout
- Weekly progress reports with photographs, so you can be away and still know exactly where it is
- Directly employed site management with vetted, insured trade subcontractors
- Construction phase plan and principal contractor duties under CDM 2015
- Building control inspections booked and attended by us at every stage
- Party wall obligations tracked so nothing starts before notice periods have run
At handover you receive
- Building regulations completion certificate
- Electrical installation certificate and gas safety documentation
- Structural engineer's sign-off where applicable
- As-built drawings and the health and safety file
- Product warranties and guarantees, collated in one pack
- A defects period, with a snagging visit after you have lived in it
Indicative programme
| Stage | Time |
|---|---|
| Survey and drawings | 24–72 hours from survey |
| Planning determination | 8 weeks for householder and minor applications |
| Building regulations and construction package | 2–4 weeks, run in parallel where possible |
| Loft conversion on site | Typically 6–10 weeks |
| Single-storey extension on site | Typically 10–16 weeks |
| Larger residential and commercial | Programmed individually at the fee stage |
Site durations depend on scale, access, ground conditions and how much of the existing building is being altered. The figure that matters is the one in your contract, and we put it there before you sign.
Included as standard
What you get
- Measured survey and existing drawings
- Full design and proposed drawings
- Planning application, submitted and managed
- Building regulations package and submission
- Structural engineering and calculations
- Party wall drawings and notice tracking
- Fixed construction price under a JCT contract
- Named project manager and weekly progress reports
- Directly managed, vetted and insured trades
- Principal designer and principal contractor duties under CDM 2015
- Building control inspections booked and attended
- Completion certificates, warranties and a snagging visit
Questions
Common questions
Is design and build more expensive?
Do I get a fixed price?
Can you build a design someone else drew?
Can I use your drawings and my own builder?
What contract do you use?
Do you take a large deposit?
What happens if something goes wrong after completion?